Join our industry expert as we review Partial Load or Rough Load Zone (RLZ) operation on Francis driven hydro generators that can result in severe machine health deterioration.
Our experts will discuss case studies and provide inside into different monitoring techniques and quantification of problems related to Rough Load Zone (RLZ).
WHEN: January 21, 2020 at 1PM EST
AGENDA:
- Monitoring techniques
- Quantification of problems related to RLZ operation
- What and how to measure on-line
- Machine behavior as a result of low frequency dynamic instability